0024
TM 10-4930-369-13&P
8.
Using 7/16 wrench, attach switch cover (Figure 10, Item 2) to switch enclosure using four captive screws
(Figure 10, Item 1).
Figure 10. Attached Switch Cover.
9.
Tighten gland nut (Figure 11, Item 1) on top of switch enclosure (Figure 11, Item 2).
Figure 11. Tighten Gland Nut on Switch Enclosure.
10. Perform an operational test IAW WP 0005.
END OF TASK
REPLACE
Remove Power Cable Section 2
Section 2 - Cable (Pump to Switch)
1. Loosen gland nut (Figure 12, Item 3) on bottom of switch enclosure (Figure 12, Item 2).
00247