TM 10-4930-369-13&P
FIELD MAINTENANCE
REPLACE POWER CABLES
INITIAL SETUP:
Tools and Special Tools
Personnel Required
Quartermaster and Chemical Equipment
Repairer 91J
Materials/Parts
References
Corrosion Preventive Compound (WP 0062, Item 7)
Equipment Condition
WARNING
Maintenance must not be performed on equipment that is operating. Failure to comply may
result in injury or death to personnel.
REPLACE
NOTE
An electrical wiring diagram (Figure 28) is provided at the end of this work package.
The power cable consists of two separate sections, joined at the toggle switch. Cable section 1 (Figure 1, Item 1),
runs from the power plug to the toggle switch. Cable section 2 (Figure 1, Item 2), runs from the toggle switch to the
pump motor electrical enclosure. Refer to for a wiring diagram of the FDS electrical system.
Figure 1.
Power Cable.
Remove Power Cable - Section 1 - Cable (Plug to Toggle Switch)
1. Loosen gland nut (Figure 2, Item 1) on top of switch enclosure (Figure 2, Item 2).
00241