• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 9. FDS Electrical Wiring Diagram.
Section 2 Cable.

OPERATOR AND FIELD MAINTENANCE MANUAL FOR TANK UNIT, FUEL DISPENSING, TRAILER MOUNTING: FUEL DISTRIBUTION SYSTEM
Page Navigation
  223    224    225    226    227  228  229    230    231    232    233  
img
. . .
0041
TM 10-4930-369-13&P
FIELD MAINTENANCE
MANUFACTURING POWER CABLE PROCEDURES
INITIAL SETUP:
Tools and Special Tools
Personnel Required
GMTK (WP 0063, Item 7)
Quartermaster and Chemical Equipment
Repairer 91J
Materials/Parts
Cable, Power, Electrical (WP 0054)
MANUFACTURING POWER CABLE
Introduction
The power cable consists of two separate sections, joined at the toggle switch. Cable section 1 runs from the
power plug to the toggle switch. Cable section 2 runs from the toggle switch to the pump motor electrical enclosure.
This work package describes how to make each cable.
Section 1 - Cable (Power Plug to Toggle Switch) Manufacture
1.  From bulk cable material, cut a length of cable 25 feet long (See Figure 1).
2.  Remove outer cable jacket insulation as follows (See Figure 1):
a.  Remove outer jacket of length 2 inches on one end. This end will connect to the power plug.
b.  Remove outer jacket of length 5 inches from opposite end. This end will connect to the toggle switch.
3.  From each wire (green, white, black), remove 0.5 inches of wire insulation.
Figure 1.
Section 1 Cable.
Section 2 - Cable (Toggle Switch to Pump Electrical Enclosure) Manufacture
1.  From bulk cable material, cut a length of cable 5 feet long (See Figure 2).
2.  Remove outer jacket of length 5 inches from each end.
3.  From one green/ground wire, remove 0.5 inches of wire insulation, approximately 1 inch from the cable jacket
insulation. This end will be installed into the toggle switch enclosure.
00411


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.