0021
TM 10-4930-369-13&P
EQUIPMENT
ITEM TO BE
ITEM
INTERVAL
NOT READY/
CHECKED OR
NO.
PROCEDURE
AVAILABLE IF:
SERVICED
repair grounding
Figure 3.
Measuring Electrical
2.
Inspect ground clips for corrosion.
FDS can't
operate due
to ground clip
damage.
Lubrication not
2
Hose Reel
Semiannually
1.
Check reel for presence of grease
performed.
and ease of movement. Lubricate
Table 5. Maintainer PMCS For FDS -- Annually.
EQUIPMENT
ITEM TO BE
ITEM
INTERVAL
NOT READY/
CHECKED OR
NO.
PROCEDURE
AVAILABLE IF:
SERVICED
1
Annually
Flow Meter
has not been
performed.
MANDATORY REPLACEMENT PARTS
Refer to the Mandatory Replacement Parts List (WP 0064).
END OF WORK PACKAGE
00213