0024
TM 10-4930-369-13&P
Figure 26.
Attach Switch Cover.
13. Tighten gland nut on bottom of switch enclosure.
14. Secure cable to frame using tie down straps (Figure 27, Item 1).
Figure 27. Secure Cable with Tie Down Straps.
15. Perform an operational test IAW WP 0005. Monitor for proper operation of the FDS.
002415