0030
TM 10-4930-369-13&P
NOTE
Ensure dust cap is installed on cam-locking itting.
5.
While irmly supporting ilter shell (Figure 4, Item 1), install drain assembly (Figure 4, Item 3) onto bottom of
shell (Figure 4, Item 2).
Figure 4.
Drain.
6.
Tighten ilter drain assembly, ensuring that all components are tight and are aligned as shown.
7.
Perform operational test IAW WP 0005. Tighten joints if needed. Monitor for proper operation of the FDS.
END OF TASK
END OF WORK PACKAGE
00305