TM 10-4930-369-13&P
OPERATOR INSTRUCTIONS
PAINTING
INITIAL SETUP:
Materials/Parts
Personnel Required
Petroleum Supply Specialist 92F
References
TOUCH UP PAINTING
1. Clean FDS thoroughly before painting (WP 0016).
2. Touch up areas on the FDS in need of painting.
END OF TASK
END OF WORK PACKAGE
00171/blank