|
|
Operator's
Maintenance
Category
Daily Schedule
Interval and
sequence No.
Paragraph
Item to be
reference
inspected
Procedure
During
After
Before
operation
operation
operation
-
10
Fuel tank
Fill tank if necessary. Check for
1
secure mounting.
Air cleaner
Check cup for quantity and condition
2
of oil. Service if necessary.
Fuel strainer
Check bowl for dirt and water.
3
Service if necessary.
Fuel lines and fittings
Tighten fittings to correct leaks.
4
Oil level in crankcase
Check dipstick; add oil if necessary.
5
Engine and pump rotation
Paragraph 2-1 a (3)
Use starting rope to check for free
6
r o t a t i o n . Report binding and
organizational
restriction to
maintenance.
Check for collapsed walls and signs of
Suction hose
7
leaking. Replace a damaged hose.
Discharge hose
8
Check for leaking hose or fittings.
Replace a damaged hose.
Check for leaks and faulty operation.
Hose nozzle
9
Refer to organizational main-
tenance.
3-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |