Click here to make tpub.com your Home Page

Page Title: Section IV. MAINTENANCE PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Section IV. MAINTENANCE PROCEDURES
3-9. General
This section describes the maintenance procedures
assigned to the operator/crew level. Follow instructions
given herein when performing the required maintenance
procedures.
3-10. Air Cleaner Service
NOTE
The air cleaner element must be
replaced after one year of service or
after it has been cleaned six times,
whichever comes first.
a. Removal.
(1) Stop the engine (para 2-5).
(2) Loosen the wing bolt on the clamp assembly (2,
fig. 3-5) and remove the assembled dust cup (3) and
flexible baffle (4). Remove the baffle from the dust cup
and empty the dust from the dust cup.
1.
Precleaner
5.
Wing nut
2.
Clamp assembly
6.
Washer gasket
3.
Dust cup
7.
Air cleaner element
4.
Flexible baffle
8.
Air cleaner body
Figure 3-5. Air cleaner, exploded view.
3-10

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business