Click here to make tpub.com your Home Page

Page Title: UNIT SERVICE UPON RECEIPT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 10-5430-239-12&P
OPERATOR AND UNIT MAINTENANCE MANUAL
(INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)
COLLAPSIBLE FABRIC TANK, PETROLEUM, 5,000 BARREL
UNIT SERVICE UPON RECEIPT
SITING
Site Preparation
WARNING
FLAMMABLE FUEL. Do not allow smoking within 100 feet (30.50 meters)
of the storage area. Post NO SMOKING signs around the area. Avoid
getting fuel on the body or clothing. If clothing becomes saturated with
fuel, remove the clothing immediately and wash body with hot soapy water
and soak clothing in soapy water. Avoid spillage of fuel. When spillage
occurs, cover the affected area with dry soil to reduce its rate of vaporization.
Be certain a suitable fire extinguisher is present and that it is properly
charged and positioned so as to be readily available in case of fire. Death or
serious injury may result if personnel fail to strictly observe safety precautions.
CAUTION
All metal on the tank and the tank accessories are aluminum alloy. Do not
drop or strike these items. Scuffed or bent accessories will not assemble
properly.
1. For ease of emptying the tank completely, dig a hole under the slope drain fitting, approximately 10
feet (3.05 m) long, 3 inches (7.62 cm) wide and 3 inches (7.62 cm) deep for the drain fitting.
2. Fold approximately 10 feet (3.05 m) of each of the tank back over the rest of the tank to expose
connections for drain assemblies located on the bottom of the tank.
3. At the point where the drain fitting strikes the ground, dig a hole approximately 36 inches (91.5 cm)
long, 36 inches (91.5 cm) wide and 3 inches (7.62 cm) deep.
For additional siting information refer to WP 0005 00.
BERM LINER INSTALLATION
Refer to WP 0005 00.
SERVICE UPON RECEIPT OF MATERIEL
Inspect the equipment for damage incurred during shipment. If the equipment has been damaged, report
the damage in accordance with the instructions of DA PAM 783-750.
Check the equipment against the packing slip to determine whether the shipment is complete. Report all
discrepancies in accordance with the instructions of DA PAM 738-750.
Check to determine whether the equipment has been modified.
0016 00-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business