TM 9-2330-398-24
3-38. DISCHARGE MANIFOLD REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
Initial Setup:
Tools/Test Equipment:
F and B valves removed (para 3-41).
General mechanic's tool kit (Item 4, Appendix B)
Piping and control assembly angle valve
removed (para 2-126).
Materials /Parts:
Semitrailer bonded and grounded (refer to
Gasket (Item 39, Appendix F)
TM 9-23309-398-10).
Self-locking nuts (13) (Item 172, Appendix F)
Equipment Conditions:
Semitrailer uncoupled (refer to
TM 9-2330-398-10).
a. REMOVAL
1. Remove three screws (1), six washers (2), and
three self-locking nuts (4) from discharge
manifold (3). Discard self-locking nuts.
2. Remove two screws (8), four washer s (5), and
two self-locking nuts (6) from discharge manifold
(3). Discard self-locking nuts.
3. Remove eight screws (7) and self-locking nuts
(11), access cover (10), and gasket (9) from
discharge manifold (3). Discard self-locking nuts
and gasket.
b. INSTALLATION
1. Install access cover (10) and new gasket (9) on
discharge manifold (3) with eight screws (7) and
new self-locking nuts (11).
2. Install two screws (8), four washers (5), and two
new self-locking nuts (6) on discharge manifold
(3).
3. Install three screws (1), six washers (2), and
three new self-locking nuts (4) on discharge
manifold (3).
FOLLOW-ON MAINTENANCE:
* Disconnect ground (refer to TM 9-2330-398-10).
3-116
|