| |
TM 9-2330-398-24
2-123. FLOW CONTROL VALVE AND FLANGE ASSEMBLY REPLACEMENT (continued).
4.
Install coupling (42) and new gasket (41) on flange assembly (1) with eight screws (27), washers (26), and new
self-locking nuts (25).
5.
Install cap (43) on coupling (42).
NOTE
To make connecting hoses easier, do not completely tighten fittings until after flow
control valve has been installed.
6.
Install elbow (7) in tee (5).
7.
Install adapter (22), tee (21), valve (19), tee (13), and drain cock (20) on flow control valve (8).
8.
Install adapter (18) on tee (21).
9.
Install check valve (23), tee (16), adapter (24), tee (5) and elbow (7) in flow control valve (8).
10.
Connect line (15) to adapter (18).
2-269
|