Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: GROUNDING ROD STORAGE TUBE RETAINING PIN REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2330-398-24 2-75. GROUNDING ROD STORAGE TUBE RETAINING PIN REPLACEMENT. This Task Covers: a. Removal b. Installation Initial Setup: Tools/Test Equipment: Equipment Conditions: •   General mechanic's tool kit (Item 4, Appendix B) •   Semitrailer uncoupled (refer to TM 9-2330-398-10). •   Semitrailer bonded and grounded (refer to TM 9-2330-398-10). a. REMOVAL 1.    Remove S-hook (2) and chain (3) from portable grounding rod (1). 2.    Remove retaining pin (4) from grounding rod storage tube (5). 3.    Remove S-hook (2) from chain (3) and retaining pin (4). b. INSTALLATION 1.    Install retaining pin (4) on chain (3) with S-hook (2). 2.    Install retaining pin (4) on grounding rod storage tube (5). 3.    Install chain (3) on portable grounding rod (1) with S-hook (2). FOLLOW-ON MAINTENANCE: •   Disconnect ground (refer to TM 9-2330-398-10). 2-169

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business