Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: FILL GAGE STORAGE TUBE CAP REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2330-398-24 2-74. FILL GAGE STORAGE TUBE CAP REPLACEMENT. This Task Covers: a. Removal b. Installation Initial Setup: Tools/Test Equipment: Equipment Conditions: •   General mechanic's tool kit (Item 4, Appendix B) •   Semitrailer uncoupled (refer to TM 9-2330-398-10). •   Semitrailer bonded and grounded (refer to TM 9-2330-398-10). a. REMOVAL WARNING Ladder has narrow tread.  Use care when climbing. 1.    Remove cap (2) from fill gage storage tube (1). 2.    Remove two S-hooks (3), spring (5), and chain (4) from fill gage storage tube (1) and cap (2). b. INSTALLATION 1.    Install chain (4) and spring (5) on fill gage storage tube (1) and cap (2) with two S-hooks (3). 2.    Install cap (2) in place on fill gage storage tube (1). FOLLOW-ON MAINTENANCE: •   Disconnect ground (refer to TM 9-2330-398-10). 2-168

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business