|
|
operated in parallel or in series. For series operation,
g. Piping. Intake and discharge pipes must both
install the flange adapters, crossover pipe, elbows, and
be independently supported near the pump so that no
assorted hardware in sequence indicated by key
strain will be transmitted to the pump casting when the
numbers in figure 2-4. For parallel operation, install the
connections are made.
two Y-fittings and gaskets to the intake and discharge
flanges on the pump as shown in figure 2-5.
Figure 2-4. Crossover connections for series operation.
2-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |