|
|
Figure 2-5. Y-Fitting connection for parallel operation.
Section II. MOVEMENT TO NEW WORKSITE
2-6. Dismantling for Movement
(7) Disconnect
the
battery
terminal
connectors, and apply protective tape to the connectors
a. Preparation for Movement.
after removal.
(1) Disconnect suction and discharge lines.
(8) Close and secure all doors and panels.
Remove auxiliary fuel line if connected. Install dust
plugs and caps to suction and discharge fittings.
b. Short Move. The pump can be moved short
distances on its skid, after the above steps are
(2) Disconnect ground cable.
performed, by using the towing eye on either end of the
(3) Make sure items on basic issue items list
skid.
are provided.
c. Long Move. After performing the steps in a.
(4) Disconnect exhaust pipe extension, if any.
above, the unit should be lifted onto a carrier by means
of the lifting bail (fig. 1-2). Block and tie unit securely to
(5) Drain fuel tank and pump casing if unit is
the bed of the carrier to prevent shifting during transport.
to be moved by common carrier.
(6) Remove the crossover pipe or Y-fitting, as
applicable.
2-6
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |