Click here to make tpub.com your Home Page

Page Title: Figure 13. Quarterly preventive maintenance services.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-4320-237-15
PAR
REF
ITEM
69
DISCHARGE NOZZLES. Check for tight connections and for
1
proper valve operation. Repair leaks.
DISCHARGE HOSES. Check for evidence of leaking and for
2
collapsed walls. Tighten connections if loose.
3
SPARK PLUG. Clean spark plug and set gap to 0.030 inch. Re-
place spark plug if electrodes are burned or if insulator is cracked.
Replace spark plug lead if frayed or damaged. Clean and tighten
lead connections.
OIL LEVEL GAGE. Add oil as indicated by level gage. Check that
4
oil has been changed at required intervals. Reference LO 5 4320-
237-15.
32
FUEL STRAINER. Clean fuel strainer. Make sure strainer ele-
5
ment is not clogged or damaged.
FUEL TANK. If fuel strainer shows excessive dirt or moisture
6
in fuel, remove, clean, and replace fuel tank. Fill to required level.
7
STARTING ROPE. Check for fraying or damage.
Figure 13. Quarterly preventive maintenance services.
20

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business