TM 5-4320-237-15
PAR
REF
ITEM
1
DISCHARGE NOZZLES. Check for tight connections and for
proper valve operation.
DISCHARGE HOSES. Check for evidences of leaking and collapsed
2
walls. Tighten connections if loose.
OIL LEVEL GAGE. Add oil as indicated by level gage. Reference
3
LO 5-4320-237-15.
4
FUEL STRAINER. Tighten bail nut if strainer is leaking. (Clean
33
weekly.
FUEL TANK. Add fuel as required.
5
6
STARTING ROPE. Check for fraying or damage.
28f
AIR CLEANER. Empty, clean, and refill dust cup.
7
SUCTION HOSE. Check for exidence of leaking and collapsed
8
walls. Tighten connections if loose.
NOTE 1. OPERATION. During operation, check for any unusual
noise or vibration. Check for both suction and discharge leaks.
Figure 12-Continued.
19
|