Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Assemble and Install Secondary Module Hoselines, Valves and Fittings
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

3-18.2 Installation. - Cont'd .  Refer to figure 2-60A. b. Place crates containing hose and fittings in their respective installation position. c. Uncrate 6-inch discharge hose assemblies (2 and 6) and position as shown. NOTE 6-inch suction hoses (8), 6-inch gate valves (9) and elbows (10 and 11) are overpacked with the 5,000 BBL tank. d. Remove  protective  caps  and  connect  6-inch  suction  hoses  (8)  to  tank  elbows  (11)  and  gate  valves  (9)  with coupling gaskets and clamps. e. Connect coupling adapters (5) to gate valves (9). f. Connect 6-inch suction hoses (6) between gate valves (9) and cross assembly (3). g. Connect 6-inch suction hoses (6) to cross assembly (6) and inlet side of pump assemblies (7). h. Connect 6-inch discharge hoses (2) between outlet side of pump assemblies (7) and cross assembly (3). i. Connect coupling adapters (4) to tank elbows (10). j. Connect 6-inch discharge hoses (2) between coupling adapters (4) and cross assembly (3). k. Connect 6-inch discharge hoses (2) between cross assemblies (3) as shown. I. Inspect all connections to verify correct installation of coupling clamps, coupling gaskets and security of cam-lock devices. 3-19   Assemble and Install Secondary Module Hoselines, Valves and Fittings  . Two (2) systems per fuel unit/six (6) per TPT. Assemblies of the secondary module are crated in a partially, assembled condition to facilitate packaging and shipping. Some assembly is required to place the units in operating condition prior to installation. a. Position crates containing 6-inch cross and Y assemblies near their respective installation sites as indicated in figure 2-61 A. b. Remove  6-inch  aluminum  cross  assembly  (3),  6-inch  aluminum  Y  assemblies  (8),  and  coupling  gaskets  from crates. c. Inspect all items for damage, cleanliness, and quantities required. d. Remove coupling clamps (3, figure 2-38) connecting flanged adapter (1) to cross (10). 3-13