3-17 Install Filter-Separators - Cont'd .
3-17.3
Approximate weight - 375 Ibs. ea.
CAUTION
Ground equipment at time of installation.
3-18 Assemble and Install Primary Module Hoselines, Valves and Fittings .
One (1) system per fuel unit/three (3) per TPT.
Assemblies of the primary module are crated in a partially assembled condition to facilitate packaging and shipping.
Some assembly is required to place the units in operating condition prior to installation. The following assembly and
installation procedures are used on the shared berm alternate shown in figure 2-60A. Procedures for the layout shown in
figure 260B or 2-60C will be the same..
3-18.1
Assembly. Refer to figure 2-38.
a.
Position crates containing cross assemblies near their respective installation sites as indicated in figure 2-60A.
b.
Remove 6-inch aluminum cross assembles, coupling clamps, caps, and coupling gaskets from crate.
c.
Inspect all items for damage, cleanliness, and quantities required.
d.
Remove four coupling clamps (3, figure 2-38) securing gate valves (9) and flanged adapters (1) to cross (10).
e.
Slide one coupling gasket over each cross (10) grooved end.
f.
Align mating surfaces of adapter (1) and cross (10). Pull coupling gasket over sealing surfaces of both pieces.
Ensure gasket is correctly positioned over full circumference of sealing surfaces. Position coupling clamp (3) over
gasket.
g.
While maintaining alignment of mating parts; lock coupling clamp securely.
h.
Repeat steps e, thru g. for remaining adapters(1).
3-18.2
Installation . Refer to figure 2-60A.
CAUTION
INTERNAL CLEANLINESS Make sure all hoselines, fittings and valves are clean internally.
Foreign materials may disrupt operations and damage equipment.
a.
Check the position of 600 gpm hoseline pump installed per paragraph 3-13.
3-12
|