|
|
TM 10-5430-238-12&P
OPERATOR AND UNIT MAINTENANCE MANUAL
(INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST)
COLLAPSIBLE FABRIC TANKS, FUEL STORAGE, 3,000,
10,000, 20,000, AND 50,000 GALLON
OPERATOR MAINTENANCE PROCEDURES
GENERAL INSTRUCTIONS
Maintenance instructions in this section will list resources required, personnel required, and equipment
condition for start of procedure, except as noted below:
NOTE
Personnel required are listed only if the task requires more than one.
MAINTENANCE PROCEDURE
EQUIPMENT
Filler/Discharge Valve and Hose Assembly ............................................................................. WP 0011 00
Coupling and Dust Cap Gasket
Vent and Pipe Assembly Coupling and ................................................................................... WP 0012 00
Dust Cap Gasket
Filler/Discharge Assembly Elbow and...................................................................................... WP 0013 00
Dust Cap Gasket
END OF WORK PACKAGE
0010 00-1/2 blank
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |