Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATING PROCEDURES
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 10-5430-237-12&P 0005 00 0005 00-7 8.  With float inflated, fit into the netting holder (3), with the inflation valve uppermost and secure in position with the drawstring on the holder. 9.  Store foot bellows in the repair pouch. OPERATING PROCEDURES (Filling the Tank) NOTE The number and type of fastening devices to attach the cover to the tank may vary between tank models. 1.  Place cover (8) over top of tank (11), ensuring that cover float (5) is positioned inside tank first, and align the ten cover handles (9) around the edge of the cover (8), with the ten handle-toggles (10) around the tank. 2.  Loop die cover handles (9) over the handle-toggles (10).  Pull the handle-toggles (10) down over the cover handles (9) and tuck the ends under the rope, to secure the cover into position.  

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business