| |
TM 10-5430-236-12&P
0024 00
0024 00-2
INSTALLATION
1. Connect chain (7) to coupling half (8) and dust cap (9) with two key holders (6).
2. Install new gasket (10) in dust cap (9).
3. Lubricate new preformed packing (4) with silicone compound. Position preformed packing (4) and
drain fitting (3) on compression fitting (5).
4. Install eight screws (1) and washers (2). Torque screws (1) to 96 in-lbs (10.84Nm). Refer to WP 0036
00 for torquing sequence.
WARNING
Do not use excessive pressure when applying sealing compound onto threads.
Sharp thread edges can cause serious injury.
5. Coat threads of coupling half (8) with sealing compound. Install coupling half (8) in drain fitting (3).
6. Install berm liner (WP 0007 00).
END OF WORK PACKAGE
7
|