Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: CCR NOZZLE ASSEMBLY REPAIR - continued
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM   10-4930-248-13&P 5-2. CCR  NOZZLE   ASSEMBLY   REPAIR   -  continued. d. Testing  -  continued. M Move  nozzle  handle  (1) to  the OPEN  (flow) position. (g) Adjust   pump  (5)  to  5 psig  at  the  nozzle  inlet  gage  (4) and  maintain  pressure   for  one  minute  minimum. (h) Slowly  increase   pump   (5) pressure   to  90  psig  at  gage  (4) and  maintain  pressure   for  one  minute minimum. (i) Reduce  pump   (5) pressure   to zero. 0) Move  nozzle  handle  (1)  to the  CLOSED  (no  flow) position;  disconnect    nozzle  assembly  (9)  from  test adapter   (3) and  install  dust  caps. HANDLE 9 2 8 (OPEN  POSITION) HANDLE (CLOSE  POSITION) 4 7 5 3 6 1.  NOZZLE HANDLE 2.  TEST  ADAPTER  OUTLET 3.  TEST  ADAPTER  INLET 4.   PRESSURE  GAUGE,   0-300    PSIG 5.   HYDRAULIC PUMP,  0-300    PSIG 6.   FILTER, 15  MICRON 7.   FLUID RESERVOIR,  10-20   GALLON 8.  3/4   INCH MANUAL SHUTOFF  VALVE - SEE NOTE 2 9.   NOZZLE ASSEMBLY NOTES: 1.  3/4"   NPT  TAPPED  HOLE IN BOTH ADAPTERS  FOR  HOSE  CONNECTIONS 2.   SHUTOFF  VALVE MUST  BE POSITIONED HIGHER (ABOVE)  THAN  NOZZLE 5-21

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business