TM 10-4320-342-24
2-13. WINCH AND CABLES REPLACEMENT - continued.
(1)
Install winch (5) with cables (7 and 8) on 200/600 GPM Pump (11).
(2)
Secure winch (5) on 200/600 GPM Pump (11) with eight bolts (1), flatwashers (2), lockwashers (3) and nuts (4).
(3)
Install insulation sleevings (9 and 10) on cables (7 and 8).
(4)
Install splice connectors (12) on cable (7) and slide insulation sleeving (9) over splice connectors and shrink.
(5)
Install nuts (13) and bolts (14) on cable (8).
(6)
Install insulation sleevings (9 and 10) over nuts (13) and bolts (14) and shrink.
(7)
Connect ends of cables (7 and 8) to 200/600 GPM Pump (11).
Figure 2-33. Winch and Cables Replacement
2-94
|