|
|
TM 10-4320-202-15
Section Ill. PREVENTIVE MAINTENANCE SERVICES
lated listing of preventive maintenance services
3 - 5 . General
which must be performed by the operator. The
To insure that the pump assembly is ready
item numbers are listed consecutively and indi-
for operation at all times, it must be inspected
cate the sequence of minimum requirements.
systematically, so that defects may be discover
Refer to figure 3-3 for Daily Preventive Main-
and corrected before they result in serious
tenance Services.
damage or failure. The necessary Preventive
Maintenance Services to be performed are listed
3-7. Quarterly Preventive Maintenance
and described in paragraphs 3-6 and 3-7. De-
Services
fects discovered during operation of the unit
shall be noted for future correction, to be made
a. This paragraph contains an illustrated
as soon as operation has ceased. Stop operation
tabulated listing of preventive maintenance
immediately if a deficiency is noticed during
services which must be performed by Organi-
operation which would damage the equipment
zationald Maintenance personnel at quarterly
if operation were continued. All deficiencies
intervals. A quarterly interval is equal to 3
and shortcomings will be recorded together
calendar months or 250 hours of operation,
with the corrective action taken on DA Form
whichever occurs first.
2404 at the earliest opportunity,
b. The item numbers are listed consecutive-
ly and indicate the sequence of minimum re-
3-6. Daily Preventive Maintenance Services
quirement. Refer to figure 3-4 for Quarterly
Preventive Maintenance Services.
This paragraph contains an illustrated tabu-
3-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |