| |
Item
No .
T M 1 0 - 3 8 3 5 - 2 1 9 - 1 4
Table 2-1. Preventive Maintenance Checks and Services (PMCS) (cont).
B - Before Operation
D - During Operation
B
D
A
Item to be inspected
P r o c e d u re
FIaking Box Assembly (cent)
b. Inspect lifting shackles (5) for cracks
or any deformation. Notify next higher
level of maintenance of damaged parts.
Inspect shackle attach bracket (6) for
cracked holes, cracked or separated
seam welds. Notify next higher level
of maintenance of damaged parts
d. Inspect eye bolt assembly (7) at rear
of box for cracks and security.
Notify next higher level of maintenance
of damaged parts
e.
Inspect tailgate assembly (8) for
cracks, breaks, holes, defective
latches or any other distortions.
Notify next higher level of
maintenance of damaged parts.
A - After Operation
Equipment is not
ready/available
if:
Shackles are cracked
or deformed.
Bracket is cracked around
holes, seams cracked or
separated.
Eye bolt is cracked, broken,
o r d e f o r m e d.
2 -5
|