| |
TM 9-2330-398-24
3-26.
ENGINE SHROUDING REPLACEMENT.
This Task Coves:
a.
Top Air Housing Cover Removal
b.
Blower Housing Removal
c.
Air Shutter Assembly Removal
d.
Rear Cylinder Housing Removal
e.
Bottom Cylinder Pan Removal
f.
Front Cylinder Housing Removal
g.
Airflow Baffle Removal
h.
Air flow Baffle Installation
i.
Front Cylinder Housing Installation
j.
Bottom Cylinder Pan Installation
k.
Rear Cylinder Housing Installation
I.
Air Shutter Assembly Installation
m. Blower Housing Installation
n.
Top Air Housing Cover Installation
Initial Setup:
Tools/Test Equipment:
Fuel lines removed from fuel tank
General mechanic's tool kit (Item 4, Appendix B)
(if removing blower housing) (para 2-97).
Engine high-temp thermostatic control switch
Materials/Parts:
removed (if removing air shutter) (para 3-28).
Lockwasher (Item 95, Appendix F)
Throttle cable at engine removed
Lockwasher (Item 96, Appendix F)
(if removing rear cylinder housing) (para 3-23).
Lockwasher (2) (Item 116, Appendix F)
Governor linkage assembly removed (if removing
Self-locking nut (5) (Item 172, Appendix F)
bottom cylinder pan) (para 3-24).
Self-locking nut (4) (Item 177, Appendix F)
Engine fuel lines disconnected (if removing bottom
cylinder pan) (para 2-98).
Equipment Conditions:
Engine throttle and choke linkage removed (para 3-23).
Semi-trailer uncoupled (refer to TM 9-2330-398-10).
Muffler and exhaust pipe removed (para 2-99).
Air cleaner hose disconnected at intake
manifold (para 2-96).
a.
TOP AIR HOUSING COVER REMOVAL
1.
Remove five screws (1), washers (11), and self-
locking nuts (10) and muffler tray (9) from two
supports (2 and 3). Discard self-locking nuts.
3-78
|