| |
TM 9-2330-398-24
3-23. ENGINE THROTTLE AND CHOKE LINKAGE REPLACEMENT (continued).
5.
Remove inside jamnut (13) from throttle cable
(4), and pull throttle cable (4) through engine shrouding
(14).
6.
Remove screw (18) and handle (17) from throttle
cable (4).
7.
Remove packing nut (16), jamnut (19), and
washer (20) from throttle cable (4).
8.
Pull throttle cable (4) through channel of control
panel (15), and remove cable (4) from semitrailer.
3-71
|