Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 9-2330-398-24 3-10.  BOGIE ASSEMBLY REPLACEMENT (continued). 3. Position  two  jacks  under  trunnion  tube  (5)  close  to  inside  of  each  trunnion  hanger  (4).    Raise  jacks  to  support weight of trunnion tube (5). 4. Remove eight self-locking nuts (6) and screws (3) from trunnion hangers (4) and two trunnion cross tube mounting brackets (1).  Discard self-locking nuts. 5. Lower and remove jacks from under trunnion tube (5). 6. Using lifting device, raise semitrailer until it clears bogie assembly (10). 7. Manually release brake air chambers (para 2-60). 8. Roll bogie assembly (10) out from under rear of semitrailer. 9. Lower semitrailer onto supports or cribbing. b. INSTALLATION 1. Using  lifting  device,  raise  rear  of  semitrailer  high  enough  to  allow  bogie  assembly  (10)  to  roll  under  rear  of semitrailer.  Remove supports or cribbing. 2. Roll  bogie  assembly  (10)  into  position  under  mounting  brackets  (1)  and  trunnion  hangers  (4)  on  each  end  of trunnion tube (5). 3. Manually set brake air chambers (para 2-60). 3-33

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business