| |
TM 9-2330-398-24
2-128. PRECHECK CONTROL TUBING ASSEMBLY REPLACEMENT (continued
7.
Install two elbows (10 and 12) on D valve (11).
8.
Install two elbows (1 and 3) on E valve (2).
9.
Connect tubing assembly (13) to elbow (12) on D valve (11).
10.
Connect tubing assembly (14) to elbow (1) on E valve (2).
11.
Connect tubing assembly (9) to elbow (10) on D valve (11).
12.
Install elbow (5) on flow control valve (6), and connect tubing assembly (9) to elbow (5).
13.
Connect tubing assembly (4) to elbow (3) on E valve (2).
14.
Install adapter (8) in tee (7), and connect tubing assembly (4) to tee (7).
FOLLOW-ON MAINTENANCE:
None
2-284
|