2-113. VAPOR RECOVERY SYSTEM REPLACEMENT (continued).
b.
INSTALLATION OF HOOD AND HOSE
1.
Install six screws (4) and new selflocking nuts
(1), adapter (2), and new gasket (3) on
semitrailer.
2.
Install four screws (16), adapter (6), and new
gasket (5) on semitrailer.
3.
Install plug (13) and clamp (14) on hood (12),
and tighten clamp (14).
4.
Install pipe (10), hose (8), and two hose clamps
(9 and 11) on hood (12), and tighten hose
clamps (9 and 11).
5.
Install clamp (15), hood (12), and hose (8), as a
unit, on semitrailer. Tighten hose clamp (7).
6.
Tighten clamp (15) on hood (12).
c.
REMOVAL OF PIPING
1.
Remove coupling (38), screen (37), and gasket (36) from coupling (35). Discard gasket.
2.
Remove two bolts (41), coupling (40), and seal (39) from elbow (18). Discard seal.
NOTE
Provide support for pipe assembly so it will not fall.
3.
Remove four self-locking nuts (33) and washers (31), two U-bolts (30), and pipe assembly (24) from bracket (29).
Discard self-locking nuts.
4.
Remove coupling (35) from pipe assembly (24).
5.
Remove eight screws (27) and self-locking nuts (28), vent (26), and gasket (25) from semitrailer. Discard gasket
and self-locking nuts.
6.
Remove four screws (17), elbow (18), and gasket (19) from adapter (20). Discard gasket.
7.
Remove six screws (23) and self-locking nuts (22), adapter (20), and gasket (21) from semitrailer. Discard self-
locking nuts and gasket.
8.
Remove four screws (32) and self-locking nuts (34), eight washers (31), and bracket (29) from semitrailer.
Discard self-locking nuts.
2-248
|