| |
TM 9-2330-272-14
5-9.
CABINET DOOR MAINTENANCE.
This Task Covers:
a.
Removal
Repair
b.
Cleaning and Inspection
d.
Installation
c.
Initial Setup:
Equipment Conditions:
Materials/Parts:
Tank purged (para 4-64).
Dry cleaning solvent (Item 16, Appendix E)
Cabinet door hinges removed (para 4-61).
Ten locknuts
Tools/Test Equipment:
General mechanics tool kit
Field automotive shop set
Welders tool kit
References:
TM 9-237
Personnel Required: Two
NOTE
Cabinet doors are replaced the same way on all models except quantity of screws and
locknuts may vary. M131A5 is Illustrated.
5-21
|