Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Table 3-1. Inspection Requirements
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  55-4920-383-13&P Table  3-1.  Inspection  Requirements Major  assembly, Item Requirement item,   or   area Each  operation  inspection Controls POWER  ON  indicator Digital  Display Electrical   connectors and  cable  assemblies Test Set front panel Test  Set  front  panel Test  Set  front  panel Test Set front panel and accessory   cables. Daily   inspection Operate  switches  and  con- trols. Performance  shall be  smooth  and  positive. Detents  shall  hold  switches firmly   in   selected   position. Check that POWER ON indi- cator  lamp  (19,  figure 2-1)  lights  when  POWER ON/OFF  switch  (20)  is set to ON. Check  that  Digital  Display (7,   figure   2-1)   cover glass  is  not  cracked. Inspect   connectors   for   bent pins,   damaged   shells, worn  or  frayed  wiring. Hardware Test  Set,  general Inspect  for  loose  or  missing hardware. Test  Set  front  panel Check  that  proper  fuse  is Fuses installed  in  fuse  holder. 3-6

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business