| |
TM 55-4920-383-13&P
Table 3-1. Inspection Requirements
Major assembly,
Item
Requirement
item, or area
Each operation inspection
Controls
POWER ON indicator
Digital Display
Electrical connectors
and cable assemblies
Test Set front panel
Test Set front panel
Test Set front panel
Test Set front panel and
accessory cables.
Daily inspection
Operate switches and con-
trols.
Performance shall
be smooth and positive.
Detents shall hold switches
firmly in selected position.
Check that POWER ON indi-
cator lamp (19, figure
2-1) lights when POWER
ON/OFF switch (20) is
set to ON.
Check that Digital Display
(7, figure 2-1) cover
glass is not cracked.
Inspect connectors for bent
pins, damaged shells,
worn or frayed wiring.
Hardware
Test Set, general
Inspect for loose or missing
hardware.
Test Set front panel
Check that proper fuse is
Fuses
installed in fuse holder.
3-6
|