| |
TM 55-4920-383-13&P
Section II. INSTALLATION
3-5.
Installation Requirements.
The Test Set does not require any special installation instructions. The unit may be
placed on a maintenance area work bench with suitable lighting and ventilation which con-
tains facilities for the power requirements listed in table 1-1.
WARNING
The Test Set must be grounded prior to connection to aircraft fuel gage system
under test (see para. 2-3 for turn-on instructions).
Section III. INSPECTIONS AND SERVICING
3-6.
Inspection Requirements.
Table 3-1 contains the requirements to complete daily, intermediate, periodic, and
special inspections as applicable to the Test Set.
These inspections must be accomplished
at the specific periods by organizational maintenance activities to as sure that all defects
are discovered and corrected before a malfunction or serious trouble occurs.
NOTE
All inspections required at each operation shall be reaccomplished during daily,
intermediate, and periodic inspections. All daily inspections shall be reaccom-
plished during intermediate and periodic inspections. All intermediate inspec-
tions shall be reaccomplished during periodic inspections.
a.
Each Operation. Every time the Test Set is operated the inspections noted in this
column shall be performed.
b.
Daily Inspection. The daily inspection is accomplished following the last operation
of the day, or preceding the next days operation.
Daily inspection requirements consist
3-4
|