| |
TM 55-4920-383-13&P
d.
Check the equipment received against the master shipping list making certain that
all the materials have been received.
e.
Check that all packing materials, dust, or other foreign matter has been removed
from the Test Set.
Pay particular attention to points of electrical contact.
f.
Report any irregularities and/or damage to the responsible activity.
3-3.
Preparation for Storage.
The method of storage of the Test Set is the same as that specified for reshipment.
Refer to paragraph 3-4 for reshipment instructions.
3-4.
Preparation for Reshipment.
Preservation, packaging, packing, and marking requirements for reshipment of the Test
Set must be in accordance with the instructions contained in figure 3-1.
3-2
|