| |
TM 55-4920-383-13&P
CHAPTER 3
AVIATION UNIT MAINTENANCE INSTRUCTIONS
Section I. PREPARATION FOR INSTALLATION, STORAGE
AND SHIPMENT
3-1.
Preparation for Installation.
CAUTION
Care should be execised when moving the Test Set. The Test Set contains
electronic and electro-mechanical components and assemblies which may be
damaged if improperly handled.
The Test Set is shipped as a single, self-contained unit, integrally housed in a combina-
tion case. No special instructions are required to unpack and prepare the test set for use.
Provision, at the using site, must be made to meet at least the minimum requirements
listed below:
a. Adequate lighting and ventilation.
b. Provision for the power requirements stated in table 1-1.
3-2.
Equipment Inspection on Delivery.
When the Test Set is received, inspect the Test Set for possible damage in transit. Report
evidence of damage immediately as required. A visual inspection of the equipment should
include the following as a minimum:
a . Check for
b . Check for
dented or sprung covers or other visible signs of external damage.
cracked or shattered glass.
c. Check all cables and accessories for evidence of damage.
3-1
|