Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: SECTION V. PREPARATION FOR STORAGE OR SHIPMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  55-2915-335-30&P SECTION  V.  PREPARATION  FOR  STORAGE  OR  SHIPMENT 2-26. General.  This section provides information for preparing the fuel boost pump, or pump cartridge, for storage or shipment. 2-27. Administrative Storage.  Administrative storage shall be in accordance with AR 750-1, Army Material Maintenance Concepts and Policies. 2-28. Storage or Shipment. Upon completion of repairs and final acceptance testing, prepare the boost pump or cartridge for storage or shipment as follows: a. b. c. d. If boost pump has been run in jet fuel, flush by running in calibration fluid (Item 2, Appendix C). Drain  all  excess  calibration  fluid. Package pump in accordance with ASTM-D3951-82. Attach maintenance reports and forms, as required. Mark storage or shipping container for identification. All container markings shall be as required by MIL- STD-129J. 2-102

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business