Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: OPERATING PROCEDURE (Continued)
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-308-13 2-2.  OPERATING PROCEDURE (Continued) (1) Remove pipe plug (1) from priming port (2). (2) Pour fuel into priming port (2) to fill volute (3). CAUTION If volute does not fill with liquid, check suction hose assembly and suction hose connection at suction (intake) coupling for leaks.  Be sure that suction hose end or drum unloader is completely immersed in fuel. NOTE As  fuel  fills  volute,  air  is  removed  through  discharge  coupling.  As  the  air  is removed, fuel from the suction side of the pump is drawn into the volute and the pump will then draw on its own. (3) Install pipe plug (1) in priming port (2) and tighten securely. 2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business