2-19. REPLACE/REPAIR DISCHARGE MANIFOLD ASSEMBLY AND DISCHARGE ELBOW (Continued)
INSTALLATION:
WARNING
Death or serious injury could occur if
unauthorized or unnecessary personnel
are in the hoisting area. Permit only
personnel
actually
engaged
in
the
hoisting operation to be near the unit
and hoisting equipment. All instructions
for the hoisting operations must come
from one authorized person.
Injury to personnel or damage to
equipment could occur from improper
hoisting. Hoist the load slowly to avoid
tearing out lifting bail assembly, slipping
slings, or load shift. Do not jerk the load
or swing it from side-to side when
hoisting. This places additional stress
on hoisting components which can
cause failure and loss of load. Be sure
hoisting equipment is on solid footing
and is suitable for the size of the load.
Watch
boom
angle
and
overhead
clearance when hoisting.
1
Position a suitable lifting device (1) equipped
with a spreader bar and slings over discharge
manifold assembly (2)
2
Attach slings around assembly and put tension
on slings. Make sure assembly is properly
supported. Spread slings on spreader bar so
that slings hang vertically when attached to
assembly.
3
Lift discharge manifold assembly and remove from blocks on work platform. Lower carefully so that discharge
manifold assembly (2) alines with pump body (3). Aline holes in 180-degree elbow with studs on pump body so
that flanges mate and engage properly.
4
Install nuts and lockwashers (3) on pump body studs Do not tighten nuts.
5
Install support bracket (5), bolts, nuts, and lockwashers (4) on skid (6). Do not tighten bolts.
6
Tighten nuts (3) alternately until secure.
7
Tighten bolts (4) securely.
2-78
|