Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section II. REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-306-24 Section II.  REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT 2-2.  COMMON TOOLS AND EQUIPMENT For  authorized  common  tools  and  equipment,  refer  to  the  Modified  Table  of  Organization  and  Equipment  (MTOE) applicable to your unit 2-3.  SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT The special tooling required to service the engine and pump assemblies is listed and illustrated in detail in TM 5-4320- 306-24P, Repair Parts and Special Tools List (RPSTL) 2-4.  REPAIR PARTS Repair parts are listed and illustrated in TM 5-4320-306-24P. Section III.  SERVICE UPON RECEIPT OF EQUIPMENT 2-5.  UNLOADING EQUIPMENT a. Before attempting to unload the Model US612ACD Centrifugal Pump Unit, make sure that the unloading facility is capable of handling 3000 pounds (1361 kg). b. Remove shipping tiedowns. WARNING Death  or  serious  injury  could  occur  if  unauthorized  or  unnecessary  personnel  are  in  the  hoisting  area. Permit   only   personnel   actually   engaged   in   the   hoisting   operation   to   be   near   the   unit   and   hoisting equipment.  All instructions for the hoisting operations must come from one authorized person. Injury to personnel or damage to equipment could occur from improper hoisting.  Hoist the load slowly to avoid tearing out lifting bail assembly, slipping slings, or load shift.  Do not jerk the load or swing it from side-to-side when hoisting.  This places additional stress on hoisting components which can cause failure and loss of load.  Be sure hoisting equipment is on solid footing and is suitable for the size of the load. Watch boom angle and overhead clearance when hoisting. c. Unload the centrifugal pump unit by lifting with a crane secured to lifting bail. 2-5

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business