| |
TM 5-4320-306-24
36. REPLACE ENGINE ASSEMBLY (Continued)
4.
Install dial gauge No.100400 (1). Pre-tension
gauge to midscale (approximately 5.0 mm) or
adjusting device No 100640 (2). Secure in
place using knurled nut (3).
5.
Slowly rotate V-belt pulley clockwise until
piston starts to push valve up. Gauge pointer (1)
will move clockwise. Continue to rotate V-bell
pulley until gauge pointer stops. This is Top
Dead Center (TDC).
6.
Stop rotation at TDC, and mark V-belt pulley at
this location. Location should align with roll pin
in front cover above pulley. Remove adjusting
device No 100640. Repeat steps 2 through 6,
if necessary.
All data on pages 3-28 and 3-29 deleted.
Change 1 3-27
|