| |
TM 5-4320-306-24
2-38. REPLACE/REPAIR TOOL BOX (AND COMPONENTS) (Continued)
INSTALLATION:
1
Position tool box (1) over mounting holes on skid
2
Install screws (2), washers (3), and nuts (4). Tighten securely.
3
Stow ground cable, brass mallet, and hose, if not in use, in tool box (1).
4
Close tool box top, be sure catches are securely fastened over strikes
2-134
|