Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: Section II. REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 5-4320-305-24 Section II.  REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT 2-2.  COMMON TOOLS AND EQUIPMENT For  authorized  common  tools  and  equipment,  refer  to  the  Modified  Table  of  Organization  and  Equipment  (MTOE) applicable to your unit. 2-3.  SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT The special tooling required to service the engine and pump assemblies is listed and illustrated in detail in TM 5-4320- 305-24P, Repair Parts and Special Tools List (RPSTL). 2-4.  REPAIR PARTS Repair parts are listed and illustrated in TM 5-4320-305-24P. Section III.  SERVICE UPON RECEIPT OF EQUIPMENT 2-5.  UNLOADING EQUIPMENT a.  Before attempting to unload the Model US612ACD-1 Centrifugal Pump Unit, make sure that the unloading facility is capable of handling 3525 pounds (1600 kg). b.  Remove shipping tiedowns. WARNING Death or serious injury could occur if unauthorized or unnecessary personnel are in  the  hoisting  area.    Permit  only  personnel  actually  engaged  in  the  hoisting operation  to  be  near  the  unit  and  hoisting  equipment.    All  instructions  for  the hoisting operations must come from one authorized person.  Injury to personnel or  damage  to  equipment  could  occur  from  improper  hoisting.    Hoist  the  load slowly to avoid tearing out lifting bail assembly, slipping slings, or load shift.  Do not   jerk   the   load   or   swing   it   from   side-to-side   when   hoisting.      This   places additional  stress  on  hoisting  components  which  can  cause  failure  and  loss  of load.  Be sure hoisting equipment is on solid footing and is suitable for the size of the  load.    Watch  boom  angle  and  overhead  clearance  when  hoisting.    Do  not attempt to manually roll the pump unit down an inclined ramp. c.  Unload the centrifugal pump unit by lifting with a crane secured to lifting bail, or roll unit down a suitable ramp using a mechanical restraining device. 2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business