| |
TM 5-4320-305-24
Section II. REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
2-2. COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE)
applicable to your unit.
2-3. SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
The special tooling required to service the engine and pump assemblies is listed and illustrated in detail in TM 5-4320-
305-24P, Repair Parts and Special Tools List (RPSTL).
2-4. REPAIR PARTS
Repair parts are listed and illustrated in TM 5-4320-305-24P.
Section III. SERVICE UPON RECEIPT OF EQUIPMENT
2-5. UNLOADING EQUIPMENT
a. Before attempting to unload the Model US612ACD-1 Centrifugal Pump Unit, make sure that the
unloading facility is capable of handling 3525 pounds (1600 kg).
b. Remove shipping tiedowns.
WARNING
Death or serious injury could occur if unauthorized or unnecessary personnel are
in the hoisting area. Permit only personnel actually engaged in the hoisting
operation to be near the unit and hoisting equipment. All instructions for the
hoisting operations must come from one authorized person. Injury to personnel
or damage to equipment could occur from improper hoisting. Hoist the load
slowly to avoid tearing out lifting bail assembly, slipping slings, or load shift. Do
not jerk the load or swing it from side-to-side when hoisting. This places
additional stress on hoisting components which can cause failure and loss of
load. Be sure hoisting equipment is on solid footing and is suitable for the size of
the load. Watch boom angle and overhead clearance when hoisting. Do not
attempt to manually roll the pump unit down an inclined ramp.
c. Unload the centrifugal pump unit by lifting with a crane secured to lifting bail, or roll unit down a suitable ramp
using a mechanical restraining device.
2-7
|