| |
TM 5-4320-304-14
Item
No.
2
TM 08922A-14/1
Table 2-2. Operators Preventive Maintenance Checks and Services - Continued
B Before Operation
A After Operation
M Monthly
D During Operation
W Weekly
Interval
ITEM TO BE INSPECTED
PROCEDURE
Lifting Strap (1).
Death or serious injury to personnel or
damage to equipment could occur if
engine lifting strap is used to lift the cen-
trifugal pump unit. The lifting strap shall
be used to lift only the engine.
Check for cracks in base metal and/or welds.
Check eye (2) for wear and cracks.
Check for corrosion, especially at mating areas.
Check condition of paint. Paint shall be in good con-
dition with no bare metal or corrosion.
Equipment is
Not Ready/
Available If:
2-7
|