|
|
4-19. Starting Switch
(2) Inspect for breaks, cracks, corrosion, or
other defects.
a. Removal. Refer to figure 4-4, and remove the
starting switch.
(3) Replace a damaged or defective starting
switch as necessary.
b. Cleaning and Inspection.
c. Installation. Refer to figure 4-4 and install the
(1) Wipe the starting switch with a clean dry
starting switch.
cloth.
Figure 4-4. Gages and panel, removal and installation. (Sheet 1 of 2).
4-10
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |