Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: STARTING THE EQUIPMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM  5-4320-228-13&P 2-5. STARTING THE EQUIPMENT. Before you operate. Always keep in mind the CAUTIONS and WARNINGS. a. Preparation for Starting. (1)  Do  the  before  operation  preventive  maintenance  services (para  2-2). (2) Prime pump as described in figure 2-2, if pump is not full of water. Do not start pump without first priming with  water. Dry operation will damage pump  seals  and  cause  pump  to  fail.  After priming, do not run pump more than 3 to 5 minutes without water flowing through it. Figure 2-2. Priming  pump. b. Starting. Start pump as shown below: NOTE Allow engine sufficient warm up time before starting pumping operations. (See caution in  para  2-5a(2).) 2-8

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business