| |
INDEX - CONT'D.
Subject
Page
-T-
Tactical Petroleum Terminal (Continued)
Site
Preparation
3-2
Selection
3-1
Tank, Fabric, Collapsible, 5,000 Bbl (See Fuel Tank, 5,000 Bbl)
Tank, Fabric, Collapsible, 50,000 Gal (See Fuel Tank, 50,000 Gal.)
Tanker-Truck Receipt Manifold
2-51
Equipment
2-51
Installation
600 Gpm Pump
3-10
Hose, Valves and Fittings
3-21
Operations
Commissioning
4-27
Fuel Transfers
4-33
Unusual Conditions
4-46 thru 4-48
-T-
Tee Assembly
2-34
Testing, Fuel
Equipment
4-5
Frequency
4-5
Laboratory Facilities, Use of
4-6
Testing Kit, Petroleum Fuels, Portable
Description
2-25/4-5
Frequency of Use
4-6
Installation
3-34
Troubleshooting
5-4
Test, Pressure
3-23
Theory of Operation
1-4/1-7
Transfer Hoseline Set
2-49
Equipment
2-49
Installation
Hose, Valves and Fittings
3-16
Meter/Strainers
3-11
Operation
Commissioning
4-27
Fuel Transfers
4-33
Unusual Conditions
4-46 thru 4-48
Index 14
|