| |
INDEX - CONT'D.
Subject
Page
-S-
Switching Manifold
2-49
Equipment
2-49
Installation
Meter-Strainer
3-11
Pipe and Fittings
3-15
Sampling Assembly
3-22/4-3
Operations
Commissioning
4-27
Fuel Transfers
4-33
Unusual Conditions
4-46 thru 4-48
System Data
2-48
-T-
Tactical Petroleum Terminal
Capacity
1-7/2-9
Clean-up
3-28
Cleaning
7-2
Commissioning
4-27
Configuration
1-5
Containers
3-4
Data
2-1
Equipment List
2-3
Flow Rate
2-10
Gaging
4-7
Hydraulics
2-51
Differential
2-52
Head
2-52
Identification
2-1/3-5
Installation
3-7
Layout
2-11
Line Loss
2-52
Lubrication
6-1
Maintenance
Corrective
6-5
Preventative
6-2
Metering
4-7
Operation
1-4/1-7
Pads
3-4
Painting
3-27
Performance (See Capacity)
Plot Plan
3-27
Pressures
1-7
Quality Assurance
4-2
Roadways
3-3
Records
4-8
Scheduling
3-2
Index 13
|