Order this information in Print

Order this information on CD-ROM

Download in PDF Format

     

Click here to make tpub.com your Home Page

Page Title: PRESSURE GAGE REPLACEMENT
Back | Up | Next

Click here for a printable version

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Combat
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
USMC
   
Products
  Educational CD-ROM's
Printed Manuals
Downloadable Books
   

 

TM 07661B-14/1 APPENDIX A A 3-15.  PRESSURE GAGE REPLACEMENT. The  pressure  gage  is  part  of  the  nitrogen  cylinder  valve  and  is  under  cylinder  pressure  even  when  the  quick-opening valve is closed. If gage is broken or inoperative, return entire cylinder assembly to field maintenance personnel. WARNING Do  not  attempt  to  remove  pressure  gage  unless  nitrogen  cylinder  is  under  zero  pressure. Nitrogen gas under high pressure can cause serious personal injury. A 3-16.  NITROGEN CYLINDER VALVE. Replacement  of  the  quick-opening  valve  on  the  nitrogen  cylinder  will  normally  be  accomplished  by  field  maintenance personnel, because the valve must be removed only with cylinder completely discharged.  If valve requires replacement, return entire cylinder assembly to field maintenance facility, with a tag attached explaining the need for replacement. WARNING Nitrogen cylinder valves must be removed only with cylinder under zero pressure.  Nitrogen gas under high pressure can cause serious personal injury. A 3-17.  AFFF SYSTEM PRESSURE REGULATOR. a. Removal. (1) Completely depressurize AFFF system, paragraph 3-12. (2) Remove AFFF nitrogen cylinder.  Refer to paragraph 3-10c. (3) Disconnect hose (3, figure 3-8), from swivel adapter (9) at outlet of pressure regulator. (4) Remove  bolt  (5)  and  lockwasher  (6)  which  fastens  regulator  tee  to  hose  reel  mounting  bracket  on  skid frame.  Remove the regulator with the regulator tee. (5) Remove hose (1), elbow (2) and short nipple (7) from regulator inlet.  Remove tee (4) and short nipple (10) from regulator outlet. b. Installation. (1) Before  assembling  or  installing  pipe  fittings,  seal  threads  using  instructions  in  NOTE,  paragraph  3-14c. Assemble  short  nipples  (7  and  10,  figure  3-8)  into  inlet  and  outlet  ports  of  pressure  regulator.    Install  elbow  (2),  with attached hose (1), on nipple in regulator inlet port.  Install tee (4) on nipple in outlet port. (2) Fasten regulator assembly to frame as shown, figure 3-8, using 1/2-inch x 3/4-inch stainless steel bolt and lockwasher installed into threads of merchant plug (8) in regulator tee. (3) Connect hose (3) to swivel adapter (9) on outlet. (4) Reinstall AFFF nitrogen cylinder.  Refer to paragraph 3-1c. (5) Pressurize system and check for leaks, paragraph 3-13. (6) Return system to standby status, paragraph 2-12a. A 3-24

Privacy Statement - Press Release - Copyright Information. - Contact Us - Support Integrated Publishing

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business